
Why a category list is the least interesting thing about a trader
Everyone publishes one. What decides whether a purchase works is whether the specification was written properly, whether the producer was checked and whether the documents match the container. The categories below are simply where we are set up to do that.
How to read these pages
Each category page says the same four things: what we actually buy within it, the standard or grade it is bought against, the certificates the destination usually requires, and how it is packed and loaded. Those four are what turn a shopping list into a quotation.
If your product is not here, that is not a refusal. Most of our lanes began with a product we had never traded, because what transfers between products is the method rather than the catalogue. What has to be rebuilt each time is the producer shortlist, and we say honestly how long that takes.
What is common to all six
- Bought against a written specification and a named standard, never against a photograph or a category name.
- Producer checked against the register of the importing country before a price is quoted, not after an order is placed.
- Priced landed, with freight, insurance, port charges, estimated duty and certification shown line by line, and the rate validity stated. Who actually pays the duty follows the agreed Incoterm.
- Inspected and photographed before the container is sealed, where the value justifies it.
- Delivered under one contract with us, in one currency, with one counterparty to hold responsible.
The six categories
A page for each, with the standards, certificates and pack that each one needs.
Questions on this
The ones we are asked most often.
Do you only supply these six categories?
No. The six are the categories we are set up to quote, so a quotation comes back in days rather than weeks. A product outside them is a sourcing project: we say so, we say how long it will take, and we quote the work honestly rather than pretending it is routine.
What is the minimum order?
There is no fixed minimum. The practical floor is whatever makes the freight sensible: a full container on most lines, or a consolidated part load where several suppliers in the same region ship together. Below that it is the logistics cost per unit that decides, not a policy of ours.
Can you supply to a specification rather than to a brand?
Yes, and across most of these categories that is the cheaper answer. A written specification with the standard, the tolerance and the certificates is what makes offers from different producers comparable. Where a brand is required we buy the brand, and the check becomes authenticity and channel instead.
How long does a quotation take?
A first reply within one working day, and a landed price in about ten working days. The time goes into producer verification and freight, not into the arithmetic.
Send a specification. Get a landed price.
Product, quantity and destination port is enough to start. If you only have a problem, describe it and we will write the specification with you.
