The question is not which supplier. It is which continent
Two offers from the same country differ by a few per cent and a lot of noise. Two offers from different continents differ by freight, duty, lead time and certification at once, and almost nobody puts those four on one page because almost nobody buys from more than one of them.
What the sheet contains
One page, one specification, three columns. Each column is a real producer we have verified, not a market average.
- Landed price at your gate, at one agreed Incoterm, with freight, insurance, port charges, estimated duty and certification shown line by line.
- Lead time from a confirmed order, separated into production and transit, because the two fail for different reasons and only one of them can be chased.
- Certification and admissibility at the destination: which marks the goods carry, which the destination requires, and what has to be arranged for the gap.
- Duty exposure at the classification we agree in writing before the order, including anti-dumping measures where they apply, because on steel and tile they very often do.
- What we would not buy there, and why. One column usually loses. Saying so is the part of the sheet worth paying for.
Why origin moves the price more than haggling does
This is not an opinion. Freight and insurance as a share of goods value, measured from customs declarations, varies by origin far more than the few per cent a negotiation on the factory price usually moves.
One product, two origins
- Cement from Viet Nam: freight and insurance ran 59.5 % of goods value.
- The same product from Poland: 12.0 %.
- A gap of 48 points before anybody argues about the price of the goods themselves.
United States imports, 2024 reporting year. Source, method and the full table on the landed price index.
Duty does the same thing in the other direction, and the two do not move together. The cheapest goods often arrive from the origin with the heaviest freight and the lightest duty, or the reverse. One column at a time cannot show you that. Three can.
Which origins we can price now
These are the origins we can price now, so a comparison comes back in days rather than weeks: China, Germany, India, Italy, Korea, Rep., Poland, Türkiye, Viet Nam.
A country outside that list is a sourcing project rather than a quotation. We will say so, say how long building the lane takes, and quote the work honestly instead of pretending it is routine.
What we need to start
- The specification, or the standard and grade. If you only have a problem to solve, describe it and we will write the specification with you.
- Quantity and how often, because a trial load and a programme price differently.
- Where it has to arrive and by when.
We do not need to know who else you are talking to, and we would rather not. The comparison is between producers, not between us and somebody else’s offer.
Questions about the comparison
The four we are asked before the first sheet.
Will all three columns be real producers?
Yes. Each one is an entity we have checked: registration, scope of business, whether it exports in its own name, and whether the bank account name matches. A column we cannot verify does not go on the sheet, and we say why it is missing.
What does the comparison cost?
On the lanes listed above, nothing, because the work is the work we would do anyway to quote you. Building a new lane takes real time and we quote that separately and in advance.
Can I take the sheet and buy direct?
You can. Most of what is on it is checkable once you know what to check, and the guides on this site tell you how. What you would be giving up is the part that is not on paper: one counterparty carrying the goods, the documents and the failure.
Why three and not five?
Because beyond three columns nobody decides. Three is enough to show the shape of the trade-off and few enough to read in one sitting.
The corridors behind the columns
Each one written out: producers, documents and what goes wrong.
Name the product. We will price it three ways.
Specification, quantity and destination is enough to start. The first sheet comes back on the lanes above within ten working days.